Austin Granite Direct: sources & evidence

View directory profile · Read structured facts

Each fact below includes its exact scope, evidence status and review dates. Missing or conflicting information stays unconfirmed.

Advertised templating-to-installation timing

Published by the business

The process page describes most projects as taking 7–10 business days from templating to installation after approval.

The company’s advertised process estimate, not a citywide remodeling timeline or guaranteed completion date.

Paraphrased from the named business page reviewed on September 29, 2026. This is a business statement, not independent verification.

Reviewed 2026-09-29 · Review due 2026-10-29 · Version 1

Cabinet readiness before templating

Published by the business

Austin Granite Direct says cabinets must be fully installed before laser templating, with the client present to confirm overhangs, cutouts and final design details.

Austin Granite Direct, Austin; published countertop laser-templating prerequisites

This is the fabricator’s stated preparation requirement. It does not confirm readiness of an individual kitchen or include plumbing, electrical or cabinet installation within the countertop contract.

Reviewed 2026-09-29 · Review due 2026-10-29 · Version 1

Design approval before fabrication

Published by the business

The company describes a digital 3D layout stage and requires final approval, signed documentation and a project deposit before fabrication proceeds.

Austin Granite Direct, Austin; published countertop design-approval stage

This records a stated approval step, not a quote or contractual term for every job. Deposit amount, refund conditions, seam placement and final production details require confirmation in the written proposal.

Reviewed 2026-09-29 · Review due 2026-10-29 · Version 1

Published fabrication deposit

Published by the business

The process page says a 70% project deposit secures fabrication after material and design details are finalized.

The advertised proposal and fabrication process; confirm deposit, cancellation and payment terms in the actual contract.

Paraphrased from the named business page reviewed on September 29, 2026. This is a business statement, not independent verification.

Reviewed 2026-09-29 · Review due 2026-10-29 · Version 1

Sink and faucet coordination

Published by the business

Austin Granite Direct asks for sinks and faucets to be finalized before fabrication and for sinks, faucets and accessories to be on site before installation.

Austin Granite Direct, Austin; published countertop fixture coordination

The source supports these client preparation steps. It does not establish who supplies each fixture, reconnects utilities, handles defects or bears delay costs; those responsibilities remain to be agreed.

Reviewed 2026-09-29 · Review due 2026-10-29 · Version 1

When reporting a correction, include this record URL and the fact you want reviewed.