Cabinet readiness before templating
Published by the business
Austin Granite Direct says cabinets must be fully installed before laser templating, with the client present to confirm overhangs, cutouts and final design details.
Austin Granite Direct, Austin; published countertop laser-templating prerequisites
This is the fabricator’s stated preparation requirement. It does not confirm readiness of an individual kitchen or include plumbing, electrical or cabinet installation within the countertop contract.
Reviewed 2026-09-29 · Review due 2026-10-29 · Version 1
Design approval before fabrication
Published by the business
The company describes a digital 3D layout stage and requires final approval, signed documentation and a project deposit before fabrication proceeds.
Austin Granite Direct, Austin; published countertop design-approval stage
This records a stated approval step, not a quote or contractual term for every job. Deposit amount, refund conditions, seam placement and final production details require confirmation in the written proposal.
Reviewed 2026-09-29 · Review due 2026-10-29 · Version 1
Sink and faucet coordination
Published by the business
Austin Granite Direct asks for sinks and faucets to be finalized before fabrication and for sinks, faucets and accessories to be on site before installation.
Austin Granite Direct, Austin; published countertop fixture coordination
The source supports these client preparation steps. It does not establish who supplies each fixture, reconnects utilities, handles defects or bears delay costs; those responsibilities remain to be agreed.