Ranked #36 in Austin
Austin Granite Direct
Directory information score: 32/100
Austin Granite Countertops
Profile updated September 29, 2026
From official pages reviewed September 29, 2026: Austin Granite Direct says cabinets must be fully installed before laser templating, with the client present to confirm design details. Its process includes a digital 3D layout and requires final approval, signed documentation and a project deposit before fabrication. The company asks for sinks and faucets to be finalized before fabrication and for fixtures and accessories to be on site before installation. Additional details from official pages reviewed September 29, 2026: The process page says a 70% project deposit secures fabrication after material and design details are finalized. The process page describes most projects as taking 7–10 business days from templating to installation after approval.
Directory information score for Austin Granite Direct
Fixed points summarize recorded information, not service quality. Missing data adds no points and may explain a lower score. Listed credentials and press mentions are not independently verified by this score.
- Public rating
- N/A/5 → 0 / 35 points
- Review Volume
- 0 reviews → 0 / 20 points
- Listed credentials
- None listed → 0 / 5 points
- Listed press mentions
- 0 mentions → 0 / 3 points
- Web Presence
- 20 / 20 points
- Recorded history
- N/A → 0 / 2 points
- Profile information
- 12 / 15 points
Key facts
- Based in
- Austin, TX
- Address
-
- Website
- https://austingranitedirect.com
- Phone
- (512) 825-5625
- Email
- austin.direct@austingranitedirect.com
- Budget tier
- Contact for estimate
Frequently asked questions
What is Austin Granite Direct's ranking among kitchen remodelers in Austin?
Austin Granite Direct is ranked #36 in Austin with a Directory information score of 32/100. This score is based on recorded public reviews, listed credentials, press recognition, portfolio presence, and experience.
What services does Austin Granite Direct offer?
Austin Granite Direct offers countertop installation. Review the firm's portfolio or contact the firm directly for details.
How much does Austin Granite Direct charge for a kitchen remodel?
Pricing information for Austin Granite Direct is not published in our directory. Contact the firm directly at (512) 825-5625 for a project-specific quote.
Where is Austin Granite Direct located and what areas do they serve?
Austin Granite Direct is based in Austin, TX. Their broader service area is not published; confirm with the firm before engaging for work outside the metro.
How do I hire Austin Granite Direct?
To hire Austin Granite Direct: Visit https://austingranitedirect.com to review their work, or call (512) 825-5625, or email austin.direct@austingranitedirect.com. Most kitchen remodelers ask about project scope, budget range, and timeline before scheduling a consultation.
Sources & evidence
Published statements, observation dates and unresolved questions for this specific profile.
Advertised templating-to-installation timing
Published by the business
The process page describes most projects as taking 7–10 business days from templating to installation after approval.
The company’s advertised process estimate, not a citywide remodeling timeline or guaranteed completion date.
Paraphrased from the named business page reviewed on September 29, 2026. This is a business statement, not independent verification.
Reviewed 2026-09-29 · Review due 2026-10-29 · Version 1
Cabinet readiness before templating
Published by the business
Austin Granite Direct says cabinets must be fully installed before laser templating, with the client present to confirm overhangs, cutouts and final design details.
Austin Granite Direct, Austin; published countertop laser-templating prerequisites
This is the fabricator’s stated preparation requirement. It does not confirm readiness of an individual kitchen or include plumbing, electrical or cabinet installation within the countertop contract.
Reviewed 2026-09-29 · Review due 2026-10-29 · Version 1
Design approval before fabrication
Published by the business
The company describes a digital 3D layout stage and requires final approval, signed documentation and a project deposit before fabrication proceeds.
Austin Granite Direct, Austin; published countertop design-approval stage
This records a stated approval step, not a quote or contractual term for every job. Deposit amount, refund conditions, seam placement and final production details require confirmation in the written proposal.
Reviewed 2026-09-29 · Review due 2026-10-29 · Version 1
Published fabrication deposit
Published by the business
The process page says a 70% project deposit secures fabrication after material and design details are finalized.
The advertised proposal and fabrication process; confirm deposit, cancellation and payment terms in the actual contract.
Paraphrased from the named business page reviewed on September 29, 2026. This is a business statement, not independent verification.
Reviewed 2026-09-29 · Review due 2026-10-29 · Version 1
Sink and faucet coordination
Published by the business
Austin Granite Direct asks for sinks and faucets to be finalized before fabrication and for sinks, faucets and accessories to be on site before installation.
Austin Granite Direct, Austin; published countertop fixture coordination
The source supports these client preparation steps. It does not establish who supplies each fixture, reconnects utilities, handles defects or bears delay costs; those responsibilities remain to be agreed.
Reviewed 2026-09-29 · Review due 2026-10-29 · Version 1
Read sources, scope and review dates